The framework for operating stand-alone battery energy storage systems (BESS) is changing rapidly. The times of open grid access are over. Increasingly, operators face technical limits and regulatory requirements that directly influence the profitability and feasibility of their projects.
At Re-Twin Energy, we have listened carefully to both our users and the market. The central question we now help answer is straightforward: How much impact do these grid limitations really have on the business case of a BESS project?
Our latest product update introduces a set of features that allow developers, consultants, and asset owners to model precisely such limitations and assess their consequences in real time. Among others, users can now simulate:
Limited grid connection capacity
Asymmetric grid connections where injection and withdrawal capacities differ
Ramp-up and ramp-down restrictions, preventing instant changes in output
Time-based injection limits, for example during PV peak hours
These limitations are not theoretical, they represent some of the most pressing challenges facing today’s storage developers. Each of them can reduce flexibility and affect revenues, sometimes significantly. With Re-Twin Energy, users can quickly determine whether a project remains viable under these new conditions and adapt their strategies accordingly.
With this update, Re-Twin Energy continues its mission to provide decision-makers in the energy storage sector with the tools they need to navigate a fast-changing market and to make investment and operational choices based on solid, data-driven insights.
Contact us today to learn more and to start working with your free test account.
Want to see what this means for your project?
Log in to the platform and test the new feature, or get in touch for a personalized demo: